精品一区二区三区免费毛片爱,国产精品人人做人人爽人人添,日韩视频在线观看,无码人妻AⅤ一区二区三区

濟南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請關(guān)注!
新聞
聯(lián)系我們
咨詢電話
15866735826

聯(lián)系:張經(jīng)理

手機: 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.gzkangqi.com/

地址:山東省濟南市章丘圣井工業(yè)園

當(dāng)前位置: 首頁 > 新聞中心 > 常見問題

木工加工棚的搭設(shè)還要注意幾點

來源:http://www.gzkangqi.com/   發(fā)布時間:2022-10-22

木工加工棚一般需根據(jù)施工計劃,安置鋼筋對焊機、切斷機、彎曲機、調(diào)直機等設(shè)備的數(shù)量及加工流水線;另還需考慮部分鋼筋原材料、加工后鋼筋的周轉(zhuǎn)及堆放;現(xiàn)場施工場地、用電等條件來確定。木工加工棚的搭設(shè)還要注意幾點:
Generally, the woodworking shed shall be equipped with the number and processing lines of steel butt welding machines, cutting machines, bending machines, straightening machines and other equipment according to the construction plan; In addition, it is also necessary to consider the turnover and stacking of some reinforcement raw materials and processed reinforcement; The site construction site, electricity and other conditions shall be determined. Several points should be paid attention to when setting up the woodworking shed:
木工加工棚的搭設(shè)還要注意一下幾點:
The following points should also be paid attention to when setting up the woodworking shed:
1.工具式木工加工棚搭設(shè)具體尺寸根據(jù)現(xiàn)場實際情況確定。
1. The specific size of the tool type woodworking shed shall be determined according to the actual situation on site.
2.搭設(shè)在塔吊回轉(zhuǎn)半徑和建筑物周邊的加工車間設(shè)置雙層硬質(zhì)防護(hù)。
2. The processing workshop set up at the slewing radius of the tower crane and around the building shall be provided with double-layer hard protection.
3.加工車間地面需硬化,宜選用砼地面。
3. The ground of the processing workshop should be hardened, and the concrete ground should be selected.
木工加工棚
4.加工車間頂部應(yīng)張掛警示標(biāo)識和宣傳用語的橫幅,橫幅寬度宜為1m。
4. The top of the processing workshop shall be hung with warning signs and banners of advertising language, which should be 1m wide.
5.工具式鋼筋加工棚需在醒目處掛操作規(guī)程圖牌,圖牌的尺寸為:寬×高=2000mm×1000mm。
5. Tool type reinforcement processing shed shall be hung with operation instruction board at a conspicuous place. The size of the board is: width × Height=2000mm × 1000mm。
6.各種型材及構(gòu)配件規(guī)格為參考值,具體規(guī)格應(yīng)根據(jù)當(dāng)?shù)仫L(fēng)荷載、雪荷載進(jìn)行核算。
6. The specifications of various profiles and components are reference values, and the specific specifications shall be calculated according to the local wind load and snow load.
7.南方地區(qū),如遇臺風(fēng)應(yīng)采取防風(fēng)措施,可設(shè)置纜風(fēng)繩。
7. In the south, in case of typhoon, windproof measures should be taken, and wind ropes can be set.
以上幾點就是問題的相關(guān)解答了,希望能夠幫助到您,您對此有什么想法可以隨時來我們網(wǎng)站http://www.gzkangqi.com咨詢吧!
The above points are the answers to your questions. I hope they can help you. If you have any ideas, please come to our website at any time http://www.gzkangqi.com Consult!